Friday, September 25, 2009

Week 17:

This week at Pitt St. the hardwood floors were sanded down. They will be stained and sealed next week and the house will be completed on Wed.







Friday, September 18, 2009

Week 16:

This week at Pitt the power line was buried and ran to the house so we now have power.







After the power line was buried, we had the whole side and back yard graded. We added seed and straw so that grass will grow.
















The flooring company will be out to the house next week to sand down all of the original hardwoods. He should be completed by Friday. We will have our final inspection by Friday of next week and we'll be ready for our Open House!! :o)

Friday, September 11, 2009

Week 14:

This week at Pitt St. we had the landscaping completed in the front yard.







The iron railing for the stairs was installed.








We installed outdoor tiles to the front porch and had.








The front door was painted along with the porch posts and railings.


Things are coming together. We had electric installed today and we will be sanding the floors shortly.



We plan to have an Open House towards the end of the month! Check back to find out the date and time!!

Friday, September 4, 2009

Week 13:

This week we had the fence installed around the left side and the back side of the property.







We also had the iron stair rails installed.








And the outside tile was being installed on the front porch!!


Things are coming along GREAT!! We should have power by the middle of next week.