Friday, June 19, 2009

Week 2:



The plumbing rough-in for the bathroom upstairs has been started. There will be a 19" soaker tub in the bathroom. The area to the right of the tub is where the washer and dryer will be located. 






The massive bushes on the right side of the house were removed along with the metal fence that lined the right side of the yard. 